Home
Products
About Us
Factory Tour
Quality Control
Contact Us
Request A Quote
News
Henan Perfect Handling Equipment Co., Ltd.
Home ProductsLadle Transfer Car

50t Molten Iron Casting Rail Electric Heavy Load Cart For Warehouse

China Henan Perfect Handling Equipment Co., Ltd. certification
China Henan Perfect Handling Equipment Co., Ltd. certification
Generally we are very satisfy with functionality of trailers and I would like to thank you for your good support and communication!

—— Tomislav Blazeka

Your solution is very convincing to me and we are looking forward to build the experimental and commercial drying plant with your equipment.

—— Veronica Cardenas

The experience we had was really remarkable and the equipment is found very good.

—— FAO Adam Fisher

I'm Online Chat Now

50t Molten Iron Casting Rail Electric Heavy Load Cart For Warehouse

50t Molten Iron Casting Rail Electric Heavy Load Cart For Warehouse
50t Molten Iron Casting Rail Electric Heavy Load Cart For Warehouse 50t Molten Iron Casting Rail Electric Heavy Load Cart For Warehouse 50t Molten Iron Casting Rail Electric Heavy Load Cart For Warehouse 50t Molten Iron Casting Rail Electric Heavy Load Cart For Warehouse

Large Image :  50t Molten Iron Casting Rail Electric Heavy Load Cart For Warehouse

Product Details:
Place of Origin: Henan China
Brand Name: Rail Ladle Transfer Car
Certification: CE ISO SGS
Model Number: Rail Ladle Transfer Car
Payment & Shipping Terms:
Minimum Order Quantity: 1
Price: USD6000-10000set
Packaging Details: Trap and wooden case
Delivery Time: 20 work days after received balance payment
Payment Terms: L/C, T/T
Supply Ability: 100sets/month
Detailed Product Description
Product Name: 100 Ton Molten Iron Casting Rail Ladle Transfer Car With High Temperature Resistant Material: Carbon Steel
Capacity: 2-150t Running Speed(min): 0-25
Motor Power(kw): 1-15 Ground Clearance(mm): 50-75
Battery Capacity: 180-600
High Light:

Casting Rail Electric Heavy Load Cart

,

Molten Iron Casting Rail Electric Cart

,

Ladle Transfer Heavy Load Cart

50t Molten Iron Casting Rail Heavy Load Electric cart for warehouse

 

Introductions of heavy load tarnsfer cart

 

The Crossing Rails Ferry Transport Cart is made up of two parts. The upper car is used for transporting cargo. The upper can can be equipped with V shape support, lifting platform. The down car is usually designed to run underground. The rail is mounted underneath the car and used for connecting with other rails in workshops which makes the upper car be able to run on parallel rails. The Crossing Rails Ferry Transport Cart can realize cargo transfer among crossing rails. It's more convenient and could be used separately compared with rotating platform.

 

50t Molten Iron Casting Rail Electric Heavy Load Cart For Warehouse 0

Main Components  

100ton Molten Iron Casting Ladle Transport-A High temperature resistant mold and die car

 

Advantages 

 

---- Low noise It causes low noise level.
---- Maximum safety Offers guarantee of maximum safety for operators and for the material handled. We really care about the safety of everyone involved in the job.
---- Easy for operation These transfer carts are easy to drive, so as soon as you get it you will be able to use it to transport your loads. We will support you to make the best out of your heavy load transporter.
---- Easy to implement into manufacturing process Operates on standard floors; Do not require complex or permanent installation
---- Suitable for All Kinds of Weight The battery powered trolley is superb for handling both small and extremely huge loads for its modular fabrication and its high payloads: up to 300 ton for each trolley.

 

50t Molten Iron Casting Rail Electric Heavy Load Cart For Warehouse 2

Production process

 

CNC Cutting 
Transport the steel plate from raw material warehouse to CNC cutting workshop for cutting. After the cutting, the workers will do some simple processing such as chip moving and setting out.
Preliminary Assembling
Put the cut steel plate together according to the design drawing
Welding
Weld the steel plate with automatic welding machine after the preliminary assembling
Post weld treatment
Test the welding section after the welding, polish and burring. Post weld treatment to eliminate welding stress
Spray Primer
Transport the structure part after processing to painting booth for spraying primer. The main component of the primer is zinc rich epoxy antirust paint. The primer is to two layers
Assembling
Assemble the structure parts after spraying primer with wheels, motors and gear box, etc.
Paint finish
Transport the assembled cart to painting booth, inspect the integrity of primer. After that paint the finish
Debugging
Debugging the cart after painting the finish with electric control system, after the debugging, the cart will test without load. And after the no load test, the cart will be tested with load. After the inspection, the cart will be transported to storage area.

 

Technical parameters

Model BXC-2t BXC-20t BXC-50t BXC-100t BXC-150t
Rated Load(t) 2 20 50 100 150
Table Size(mm) Length(L) 2000 4000 5500 6500 10000
  Width(W) 1500 2200 2500 2800 3000
  Heigth(H) 450 550 650 900 1200
Wheel Base(mm) 1200 2800 4200 4900 7000
Rail Inner Gauge(mm) 1200 1435 1435 2000 2000
Wheel Diameter(mm) 270 350 500 600 600
Wheel Quantity 4 4 4 4 8
Ground Clearance(mm) 50 50 50 75 75
Running Speed(min) 0-25 0-20 0-20 0-20 0-18
Motor Power(kw) 1 2.2 5 10 15
Battery Capacity(Ah) 180 180 330 440 600
Battery Voltage(V) 24 48 48 72 72
Running Time When Full Load 4.32 4 3.3 3.2 2.9
Running Distance for One Charge(Km) 6.5 4.8 4 3.8 3.2

 

 

 

Contact Details
Henan Perfect Handling Equipment Co., Ltd.

Contact Person: Jack

Tel: +8615736919601

Send your inquiry directly to us (0 / 3000)